![]()
Global
These are navigation links to move inside this page.
![]()
Quick links to OMRON IA in your country / territory.
Please contact our European headquarters.
Question
Should the load be connected to the LOAD or to the INPUT terminal?
Answer
The load must be connected to the LOAD terminal.